When the grid drops, three different pieces of equipment can keep a business running: an uninterruptible power supply (UPS), a standby generator and a commercial battery designed for backup. They are often discussed as if they were rivals. They are not. Each one answers a different question: how fast the power must come back, how long it must last, and what the equipment does for the other 364 days of the year when the grid is fine.

This guide sets out what each option really does, the design details that decide whether a battery can provide backup at all, and a simple way to size the backup element before you talk to an installer. For the wider decision, see our guide to buying commercial storage.

First, a trap: most grid-connected batteries switch off in a power cut

A behind-the-meter battery bought to cut peak charges is, by default, a grid-following system. When the network fails, its protection is required to disconnect it from the grid. That is loss-of-mains protection, part of the G99 connection requirements, and it exists so the battery cannot energise a network that engineers believe is dead. Unless the system was specified for backup, it simply stops, and your site goes dark along with everyone else’s.

A battery only provides backup if it was designed to. That takes three things:

If a quote for “battery storage with backup” does not name all three, ask. And the backup arrangement belongs in the G99 application, not bolted on afterwards.

What each option does

Uninterruptible power supply (UPS)

A UPS sits between the mains and a specific set of loads, usually IT, comms and control systems. An online (double-conversion) UPS supplies those loads through its own electronics all the time, so a mains failure causes no break at all. That is why server rooms and payment systems use them.

The trade-off is runtime and scope. A UPS is normally sized to carry a limited load for minutes, long enough to ride through a short interruption or shut systems down cleanly. It does nothing on a normal trading day except wait.

Standby generator

A diesel or gas standby generator gives the longest runtime: as long as there is fuel, it keeps running. That matters for sites where an outage could last many hours, such as hospitals, cold stores with high-value stock and sites with life-safety systems.

Generators are not instant. An automatic mains failure panel detects the outage, starts the engine and transfers the load once the set is up to speed, which takes seconds, not milliseconds. So sites with sensitive IT pair a generator with a UPS. Generators also need regular test runs under load, fuel management and servicing to stay reliable. In England, a diesel tank holding more than 200 litres outside a building falls under the Control of Pollution (Oil Storage) (England) Regulations 2001, which set containment requirements. Between faults, a generator earns nothing.

Backup-capable commercial battery

A battery designed for backup can pick up essential loads very quickly. How quickly depends on the design: some architectures switch in a short break as the transfer switch operates, others keep critical loads on the battery’s electronics continuously. The runtime is fixed by the usable energy (kWh) you reserve for outages.

The difference is what it does the rest of the year. The same battery works every day on peak-shaving and load shifting, cutting red-band distribution charges and moving cheap overnight energy into the expensive afternoon. It is the only one of the three options that pays for itself when nothing goes wrong.

The trade-off nobody mentions: reserved charge

A battery cannot spend energy on peak-shaving and hold the same energy back for a power cut. Every kWh you reserve for backup is a kWh that cannot earn money that day. A 30% reserve means only 70% of the usable capacity works on savings.

That is not a reason to avoid backup. It is a reason to size the reserve deliberately: protect the loads that genuinely cost money when they stop, for the time you genuinely need, and let the rest of the capacity earn. A good feasibility model shows the saving both with and without the reserve, so you can see what resilience costs.

How to size the backup element

The arithmetic is simple enough to do before you speak to anyone:

  1. List the essential loads and their power in kW. Use nameplate ratings or, better, logged demand for the circuits concerned.
  2. Decide the runtime you need. Minutes to shut down cleanly? One hour to finish a shift? Four hours to protect chilled stock?
  3. Multiply. Essential load (kW) × runtime (hours) = the usable energy (kWh) to reserve. For example, 40 kW of essential load for 2 hours means reserving 80 kWh of usable capacity.
  4. Allow for losses and limits. Inverter efficiency and the cells’ permitted depth of discharge mean the installed capacity must be larger than the usable reserve. Your installer should show this step.
  5. Check the power rating as well as the energy. The inverter must supply the essential loads’ combined peak, including motor start-up currents, not just their average.

If step 3 produces a reserve that would swallow most of the battery, the honest answer is usually a battery for short outages and daily savings, with a generator behind it for long outages.

When a site needs more than one

Questions to ask before you sign

Location matters too, because your distribution network operator’s red-band times shape the daily savings the battery earns between outages. Our guide to backup power for Milton Keynes businesses works through this for one of the UK’s densest distribution markets, and commercial battery backup power covers the design in more depth. For your own site, the feasibility summary below models the saving with and without a backup reserve.

This guide is independent information published by SEO Dons Ltd. We are not an installer; we model the numbers and, if storage stacks up, introduce you to MCS-certified installers.

FREE FEASIBILITY

Get the numbers for your own site

This guide is general. The only figure that matters is yours, modelled from your own consumption and tariff.

What you get, within 3 working days: a 2-page battery feasibility summary naming your indicative system size (kW and kWh), the installed cost band, which value streams actually apply to your site (peak-shaving, red-band DUoS avoidance, load shifting, solar self-consumption, grid services), and an honest payback range. If storage does not stack up for your site, the summary says so.

What we will not do
  • We do not run a lead auction. Your details are never sold or passed to a panel of installers.
  • No marketing list, no newsletter sign-up, no unsolicited calls.
  • We will not oversize a system to inflate a quote, or model a payback we cannot defend.

Published by SEO Dons, a specialist commercial energy information network. We are independent: we are not an energy supplier and not a battery manufacturer.

We reply within one working day. Prefer to talk first? +44 7707 970661

Independent guidance for UK commercial sites

  • Independent & supplier-neutral
  • No manufacturer tie-ins
  • UK commercial & industrial sites