DUoS charges explained: red band, capacity and what a battery can cut

Distribution Use of System charges are the part of a commercial electricity bill that rewards when you use power, not just how much. They are also the part a battery is best placed to attack.

On a half-hourly metered site, the energy itself is only part of what you pay. Layered on top are the costs of moving that energy through the local network — Distribution Use of System, or DUoS — plus capacity charges for the connection you hold. Understanding the shape of those charges is what separates a battery that pays back from one that does not. Whether those charges make a battery worthwhile is one of six checks in our guide to buying commercial battery storage.

FREE FEASIBILITY

How much of your bill sits in the red band?

Send the postcode and rough annual spend. We read your consumption shape and show what peak-time charges are actually costing you.

Within 3 working days: a 2-page summary with your indicative system size, installed cost band, the value streams that apply to your site and an honest payback range. If storage does not stack up, it says so.

No lead auction and no marketing list. Published by SEO Dons, an independent information site: not an installer, supplier or manufacturer.

The two parts that matter

Time-banded unit charges. Distribution unit charges are split into red, amber and green bands. Red covers the weekday peak and costs the most per kWh; green covers nights and weekends and costs the least; amber sits between them. Every kWh you move out of red and into green is charged at a lower rate.

Capacity charges. Half-hourly sites agree a capacity with the network in kVA and pay for it as a standing charge, used or not, with excess charges if you go past it. That makes a short, sharp peak expensive twice over: it lands in the red band, and it sets the capacity you must reserve.

Find your own red band hours

Red band hours are not national. They are set for each distribution licence area in that network operator's published charging statement, and they can change between charging years. Anyone who tells you the red band is the same everywhere is guessing.

Three ways to get yours: ask your supplier for the DUoS bands applied to your supply; look up the current Use of System charging statement published by your network operator; or read them off a fully itemised bill, which some suppliers break out by band. If you do not know which operator covers your site, check a postcode against an industry grid supply point lookup rather than assuming from the county — network boundaries do not follow county lines.

What the Targeted Charging Review changed

Ofgem's Targeted Charging Review decided that residual network charges — the part that recovers the cost of existing infrastructure rather than the cost of your behaviour — would be recovered through fixed charges, with customers placed in bands. Its decision put it plainly: "Residual charges will be levied in the form of fixed charges for all households and businesses."

The practical consequence for large users arrived with the transmission changes in April 2023. Classic triad avoidance, where a site cut demand across a handful of winter evening peaks to reduce transmission residual charges, no longer produces the saving it once did, because that element is now a fixed charge banded by capacity. What remains firmly behaviour-based is distribution: the red band still costs more per kWh, and capacity charges still follow the capacity you reserve. That is where a battery earns.

The arithmetic on your own bill

You do not need a model to see the shape of the opportunity. Take a year of half-hourly data and do three things:

  1. Total your red-band consumption. Sum the kWh that fall inside your area's red hours on weekdays. That is the pool a battery can move into cheaper hours.
  2. Find your peak half-hour. The highest demand in the year, in kW, is what your agreed capacity has to cover. Compare it with the capacity you are paying for.
  3. Count how often you approach that peak. If the site touches its maximum on a handful of half-hours a year, a modest battery can shave them; if it sits near maximum all afternoon, you need far more stored energy to make the same difference.

Those three numbers decide both the size of the battery and whether the case works at all. The method is set out in full on our cost and payback guide, and peak shaving covers how the discharge is scheduled.

How a battery actually cuts the charge

A commercial battery charges when distribution charges are low — overnight, at weekends, or from your own solar — and discharges through the red band. Three savings follow: the red-band units you no longer import, the peak demand you no longer set, and, where the peak reduction is reliable, the possibility of holding a lower agreed capacity. Reducing agreed capacity is a decision to take with the network operator rather than a switch to flip, because capacity given up may not be available later if the business grows.

Two cautions. Round-trip efficiency means you buy slightly more kWh than you discharge, so the saving is the price difference minus those losses. And if you also want the battery to hold charge for backup power, the reserved energy is not available for peak-shaving that day — a trade-off worth pricing rather than hiding.

Where this leaves a business case

DUoS is not a reason to buy a battery on its own. It is one of the stacked value streams — alongside load shifting, solar self-consumption and, on suitable sites, grid services revenue — and it is usually the most predictable of them, because it depends on your own consumption shape rather than on a market. A feasibility summary that cannot show you the red-band figure it used has not done the work. Connection questions that follow are covered on our G99 application page.

DUoS charges: common questions

What are DUoS charges?

Distribution Use of System charges are what your distribution network operator charges for using the local network. They reach you through your electricity supplier, either itemised on the bill or built into your unit rates. For a half-hourly metered business they have two main parts: unit charges that vary by time of day (the red, amber and green bands) and a capacity charge based on the capacity you have reserved.

What is the DUoS red band?

The red band is the most expensive time band for distribution unit charges, covering weekday peak hours. The exact hours are set for each licence area in the network operator’s published charging statement, so they differ between regions and can change between charging years. Find your own area’s times before sizing anything around them: your supplier can tell you, and the statement is published by your DNO.

How much of my bill is DUoS?

It varies by site, tariff and consumption shape, so the only reliable answer comes from your own bill and half-hourly data. What is consistent is where it concentrates: a site with sharp weekday afternoon peaks pays far more in red-band units and capacity charges than a flat-load site with the same annual consumption.

What is a kVA or available capacity charge?

Half-hourly metered sites agree a capacity with the network, measured in kVA, and pay a standing charge for it whether or not it is used. Exceed it and excess capacity charges usually apply. Because the charge follows the capacity you reserve rather than the energy you use, shaving a peak that only occurs briefly can matter twice: it cuts red-band units and it can make a lower agreed capacity viable.

Does triad avoidance still work?

Not as it used to. Ofgem’s Targeted Charging Review decided that residual network charges would be levied as fixed charges rather than through consumption at peak times, with half-hourly sites banded. Since those transmission changes took effect in April 2023, avoiding a handful of winter peaks no longer delivers the residual saving it once did, which moves the value to distribution red-band charges and capacity management.

How does a battery cut DUoS charges?

It shifts when you draw from the network. Charging in cheap green-band hours and discharging through the red band removes the most expensive units of the day, and flattening the site’s peak can make a lower agreed capacity viable. Neither saving depends on exporting anything, which is why a behind-the-meter battery still pays on a constrained connection.

Sources

FREE FEASIBILITY

See what your peak charges are really costing

Send the postcode and rough annual spend. We model the red-band and capacity element of your bill and show what a battery would remove.

What you get, within 3 working days: a 2-page battery feasibility summary naming your indicative system size (kW and kWh), the installed cost band, which value streams actually apply to your site (peak-shaving, red-band DUoS avoidance, load shifting, solar self-consumption, grid services), and an honest payback range. If storage does not stack up for your site, the summary says so.

What we will not do
  • We do not run a lead auction. Your details are never sold or passed to a panel of installers.
  • No marketing list, no newsletter sign-up, no unsolicited calls.
  • We will not oversize a system to inflate a quote, or model a payback we cannot defend.

Published by SEO Dons, a specialist commercial energy information network. We are independent: we are not an energy supplier and not a battery manufacturer.

We reply within one working day. Prefer to talk first? +44 7707 970661

Independent guidance for UK commercial sites

  • Independent & supplier-neutral
  • No manufacturer tie-ins
  • UK commercial & industrial sites